27-tonne bridge installed in Floriade Park without emissions

In the municipality of Haarlemmermeer, we successfully installed a new bicycle bridge at its final location. Due to its location in Floriade Park, the local government expressly requested that the project be carried out emission-free.

We used one of our 80-tonne electric crawler cranes from SANY for this lifting work. The bridge was transported by an electric truck from Pultrum and then unloaded and positioned by our team.

We carefully manoeuvred the 27-tonne bridge from the unloading site to its final location using the crane’s crawlers and positioned it there with precision. Thanks to the use of electric equipment, this project was carried out without any emissions on site.

Zero-emission lifting in practice

This project underlines our commitment to using electric machines for projects where sustainability and minimising environmental impact are crucial. By carefully planning the logistics, crane setup and route in advance, we were able to work efficiently and within the specified emission requirements.